Illustrations

October 2012 - Total has completed the process of securing G4 well by setting of five cement plugs

October 2012 - Total has completed the process of securing G4 well by setting of five cement plugs

Download the illustration

Two technical solutions are being progressed in parallel to stop the leak

Two types of action have been identified and are being progressed in parallel to stop the leak. The first is by a well control intervention during which heavy mud is pumped into the G4 well from the wellhead. The second consists of drilling two relief wells in the vicinity of the G4 well to intercept it and pump in heavy mud at the formation level to regain control of the well.

Download the illustration
Elgin G4 well architecture offshore

Elgin G4 well architecture offshore

Download the illustration
Elgin-Franklin complex

Elgin-Franklin complex

Download the illustration

Location of the fields of Elgin and Franklin

Download the illustration